Old pipe condition

Old pipe condition

Old pipe condition
*
Old pipe material
*
k-value: * mm k-value: 0 mm

Which picture comes closest to the renovation object?

*

Groundwater and overburden

The traffic load SLW60 is assumed. In accordance with DWA A 143-2, a groundwater load of at least 1.5 m above the bottom is assumed. Please note that other concepts and basic materials can also be realized with our winding pipe method. If you need more details for your project, please contact us.
Cover above crown [m]
*
Groundwater above invert [m]
*